سنقاپور متروسو
ظاهر
| Mass Rapid Transit (MRT) | |||
|---|---|---|---|
| فایل:Logo of Singapore MRT.svg | |||
|
From top left to bottom right: Entrances of the Toa Payoh, Little India stations; Exterior of Jurong East station; East West Line (EWL) platforms at Expo station and Thomson–East Coast Line platforms at Caldecott station | |||
| ایطلاعات | |||
| مالیک | Land Transport Authority | ||
| یئر | سنقاپور | ||
| ترانزیت نؤوعو | مترو | ||
| خط ساییسی | 8[note ۱] | ||
| دۇراق ساییسی | 187[note ۲] | ||
| گونلوک موسافیر ساییسی | 3.4 million (2019)[۱][note ۳] | ||
| ایللیک موسافیر ساییسی | 1.2 billion (2019)[note ۴] | ||
| وبسایت | |||
| ایداره | |||
| خیدمته گیریشی | ۷ نوْوامبر ۱۹۸۷ | ||
| ایشلتمهچی(لر) | SMRT Trains SBS Transit | ||
| قاطار ساییسی | 579 trains[note ۵] comprising >2,600 carriages[note ۶] | ||
| قاطار اۇزونلوغو | 3–6 carriages[note ۷] | ||
| گئت-گل زامانی | Peak: 1–3 minutes Off-peak: 5 minutes[۲] | ||
| فنی | |||
| سیستم اۇزونلوغو | ۲۱۶ km (۱۳۴ mi)[note ۸] | ||
| ریل اؤلچوسو | شابلون:RailGauge | ||
| مینیموم یای یاریچاپی | ۴۰۰–۵۰۰ m (۱٬۳۱۲٫۳۴–۱٬۶۴۰٫۴۲ ft) (mainline), ۱۹۰ m (۶۲۳٫۳۶ ft) (depot)[۳] | ||
| برق سیستمی | 750 V DC third rail[note ۹] شابلون:1,500 V DC overhead catenary[note ۱۰] | ||
| اۆست سورعت | ۷۸–۹۰ km/h (۴۸–۵۶ mph) (service) ۹۰–۱۰۰ km/h (۵۶–۶۲ mph) (design) | ||
| |||

سنقاپور متروسو سنقاپور اؤلکهسینده فعالیت ائدن مترو'دور. بو مترو بوکیت پنجنگ، سنقکانق و پونقول یاشاییش منطقهلرینده فعالیت ائدیر.[۴]
بیرده باخ
[دَییشدیر]قایناق
[دَییشدیر]- ↑ Tan, Christopher (13 February 2020). "Bus, train ridership rises to new high". https://www.straitstimes.com/singapore/transport/bus-train-ridership-rises-to-new-high. سنقاپور متروسو
- ↑ Rail Network.
- ↑ CIVIL DESIGN CRITERIA FOR ROAD AND RAIL TRANSIT SYSTEMS. LTA Engineering Group. آرشیولنیب اصلی نۆسخهدن on 2017-08-29. یوْخلانیلیب2021-10-15.
- ↑ شهری قاطار. آرشیولنیب اصلی نۆسخهدن on 2021-12-24. یوْخلانیلیب2022-01-06.
- ↑ 6 in operation, 2 under construction; excluding LRT
- ↑ 127 in operation, 58 under construction or planning, 2 reserved; excluding LRT
- ↑ excluding LRT
- ↑ excluding LRT
- ↑ 488 trains in operation, 106 older trains to be decommissioned by 2026 and replaced with 106 newer equivalents, 91 additional trains on order; excluding LRT
- ↑ 2,278 passenger carriages in operation, 636 older passenger carriages to be decommissioned by 2026 and replaced with 636 newer equivalents, 291 additional passenger carriages on order, at least 31 railway maintenance vehicles in operation; excluding LRT
- ↑ 3-carriage configuration: Circle Line, Downtown Line, Jurong Region Line (minimum)
4-carriage configuration: Thomson-East Coast Line, Jurong Region Line (maximum)
6-carriage configuration: North South Line, East West Line, North East Line, Cross Island Line - ↑ excluding LRT
- ↑ North South Line, East West Line, Circle Line, Downtown Line, Thomson-East Coast Line, Jurong Region Line
- ↑ North East Line
<ref> برای گروهی به نام «note» وجود دارد، اما برچسب متناظر با <references group="note"/> یافت نشد.