پرش به محتوا

سنقاپور متروسو

ویکی‌پدیادان، آچیق بیلیک‌لیک‌دن
Mass Rapid Transit (MRT)
فایل:Logo of Singapore MRT.svg
Exit of Toa Payoh MRT station
Exit of Little India MRT station
Exterior of Jurong East MRT station
Platform of Expo MRT station
Platform of Caldecott MRT station
From top left to bottom right: Entrances of the Toa Payoh, Little India stations; Exterior of Jurong East station; East West Line (EWL) platforms at Expo station and Thomson–East Coast Line platforms at Caldecott station
ایطلاعات
مالیکLand Transport Authority
یئرسنقاپور
ترانزیت نؤوعومترو
خط سایی‌سی8[note ۱]
دۇراق سایی‌سی187[note ۲]
گونلوک موسافیر سایی‌سی3.4 million (2019)[۱][note ۳]
ایللیک موسافیر سایی‌سی1.2 billion (2019)[note ۴]
وب‌سایت
ایداره
خیدمته گیریشی۷ نوْوامبر ۱۹۸۷؛ ۳۸ ایل قاباق (۱۹۸۷-۱۱-07)
ایشلتمه‌چی(لر)SMRT Trains
SBS Transit
قاطار سایی‌سی579 trains[note ۵] comprising >2,600 carriages[note ۶]
قاطار اۇزونلوغو3–6 carriages[note ۷]
گئت-گل زامانیPeak: 1–3 minutes
Off-peak: 5 minutes[۲]
فنی
سیستم اۇزونلوغو۲۱۶ km (۱۳۴ mi)[note ۸]
ریل اؤلچوسوشابلون:RailGauge
مینیموم یای یاری‌چاپی۴۰۰–۵۰۰ m (۱٬۳۱۲٫۳۴–۱٬۶۴۰٫۴۲ ft) (mainline),
۱۹۰ m (۶۲۳٫۳۶ ft) (depot)[۳]
برق سیستمی750 V DC third rail[note ۹]
شابلون:1,500 V DC overhead catenary[note ۱۰]
اۆست سورعت۷۸–۹۰ km/h (۴۸–۵۶ mph) (service)
۹۰–۱۰۰ km/h (۵۶–۶۲ mph) (design)
MRT network map

سنقاپور متروسونون خریطه‌سی

سنقاپور متروسو سنقاپور اؤلکه‌سینده فعالیت ائدن مترو'دور. بو مترو بوکیت پنجنگ، سنقکانق و پونقول یاشاییش منطقه‌لرینده فعالیت ائدیر.[۴]

بیرده باخ

[دَییشدیر]

قایناق

[دَییشدیر]
  1. Tan, Christopher (13 February 2020). "Bus, train ridership rises to new high". https://www.straitstimes.com/singapore/transport/bus-train-ridership-rises-to-new-high. سنقاپور متروسو
  2. Rail Network.
  3. CIVIL DESIGN CRITERIA FOR ROAD AND RAIL TRANSIT SYSTEMS. LTA Engineering Group. آرشیولنیب اصلی نۆسخه‌دن on 2017-08-29. یوْخلانیلیب2021-10-15.
  4. شهری قاطار. آرشیولنیب اصلی نۆسخه‌دن on 2021-12-24. یوْخلانیلیب2022-01-06.
  1. 6 in operation, 2 under construction; excluding LRT
  2. 127 in operation, 58 under construction or planning, 2 reserved; excluding LRT
  3. excluding LRT
  4. excluding LRT
  5. 488 trains in operation, 106 older trains to be decommissioned by 2026 and replaced with 106 newer equivalents, 91 additional trains on order; excluding LRT
  6. 2,278 passenger carriages in operation, 636 older passenger carriages to be decommissioned by 2026 and replaced with 636 newer equivalents, 291 additional passenger carriages on order, at least 31 railway maintenance vehicles in operation; excluding LRT
  7. 3-carriage configuration: Circle Line, Downtown Line, Jurong Region Line (minimum)
    4-carriage configuration: Thomson-East Coast Line, Jurong Region Line (maximum)
    6-carriage configuration: North South Line, East West Line, North East Line, Cross Island Line
  8. excluding LRT
  9. North South Line, East West Line, Circle Line, Downtown Line, Thomson-East Coast Line, Jurong Region Line
  10. North East Line
قایناق خطاسی برچسب <ref> برای گروهی به نام «note» وجود دارد، اما برچسب متناظر با <references group="note"/> یافت نشد.